Front
Side Renovation Update
Update as of 11/02/08
Construction
on the front side renovation began September 3, 2008. Facades
of units were removed and photos below show what was discovered
in the process.
Photos
of Ongoing Front Side Construction
|
Click
on photos to enlarge
|
Update
of progress as of 10-05-08 |
Front
view with siding and railing installed>
|
 |
 |
 |
 |
Damage
found and restoration
Internal
View of 722
rot found >
|
 |
 |
| |
 |
 |
| |
 |
<
repair
repair
v |
Unit
726 damage found > |
 |
 |
Unit
732 damage found> |
 |
 |
723
damage found and fix > |
 |
 |
Update
of progress as of 9-22-08 |
Front
view as of 9-22-08 > |
 |
 |
| |
Siding
being installed on Unit 736 on 09-22-08> |
 |
Update
of progress as of 9-13-08 |
Contruction
begins >
|
 |
 |
Internal
View of
Rot found > |
 |
 |
| |
 |
<
second floor water damage at floor level |
Infrastructure
Replacement > |
 |
 |
 |
< Rot found
Infrastructure